Stadler+Schaaf plans and supplies the complete electrical and automation equipment and facilities for the energy and environment sectors.
Project example:
Construction of a new biodiesel plant
Stadler+Schaaf supplied the complete electrical and process control equipment for the construction of a new biodiesel plant with an annual capacity of 150,000 tonnes and the associated tank and loading facilities.
Scope of supplies and services
The contract included the detail engineering, supply, installation and commissioning of the complete electrical and process control equipment and the installation and commissioning of the I&C devices. The monitoring and control of the plant is performed entirely via a PCS7 process control system, from the raw material storage tank farm to the loading of the finished product.
Special features
Profibus-PA fieldbus system for a total of 150 I&C devices, integration of third-party systems – gas warning system, tank level measurement system – via Profibus-DP, remote IO systems in category zone 1.
Project duration
This project was completed in a period of around 7 months with a total of approximately 3,000 hours of engineering and 9,000 hours of installation and commissioning.
Other projects
Detail engineering, supply, installation and commissioning of the entire electrical, I&C and process control equipment for steam generators
Detail engineering, supply and commissioning of the entire electrical, I&C and process control equipment for the construction of a new complex for the treatment and processing of solid radioactive waste and operating materials in the Ukraine
Modernisation of process control equipment for a combined-cycle power plant
Detail engineering and supply of all the electrical and I&C junction boxes for a 900 MW coal-fired power plant in China
Modernisation of the control system for the water-steam cycle of a waste-to-energy plant
Programming, supply and commissioning of fire master computers for waste incineration plants