Process Plant Engineering
 
 
 

Stadler+Schaaf supports plant designers and engineers in the planning and supply of electrical and automation equipment and facilities for various industries.

We have references and experience in working with German and international companies, as well as in global projects, e.g. in China, Thailand, Russia, Ukraine, the USA and Saudi Arabia. The equipment and facilities are planned and installed in accordance with the appropriate national standards and regulations, and are commissioned by experienced, highly skilled employees.


Project example:
Process control systems for silos and product conveyance in a polyethylene plant

Stadler+Schaaf supplied the complete process control equipment for silos and product conveyance as part of a plant for the production of polyethylene in Saudi Arabia, which was built as a turnkey project by a well-known plant construction company.

Scope of supplies and services

The contract included the detail engineering, programming, supply and commissioning of the PCS7 process control system for the conveyor and silo units with a total of around 9,000 IO signals, 13 automation stations with a high degree of availability and two redundant process data servers, as well as the detail engineering, construction, supply and commissioning of the signal conditioning and marshalling rack cabinets.

Special features

Implementation of extensive conveyor path matrices, linking to the higher level control system, as well as vibration monitoring systems via Modbus, project-specific control libraries.

Project duration

This project was completed in a period of around 24 months, with approximately 12,000 hours of engineering in total.

 

Other projects

Detail engineering, manufacturing and supply of UL-compliant switchgear and control cabinets, and the process control technology for ultrafiltration plants and solvent recovery plants in the USA

Detail engineering, supply and commissioning of coker control systems for petrochemical plants in Russia

Detail engineering, supply, installation and commissioning of the entire electrical, I&C and process control equipment for steam generators